Composite Shielded Insulated Tubular Busbar Body | |
Ⅰ. Processing and customization requirements: Customized processing according to drawings. The price of copper tubes is determined by the copper tube specifications (outer diameter * wall thickness), the copper price at the time of ordering, and the supplier's procurement management fee. The copper tubes are recommended to be purchased by the buyer. The quotation amount only includes the busbar body insulation processing, including the busbar composite shielding insulation layer, grounding screen, busbar grounding wire, outer sheath and elbow (excluding soft connections with equipment, GIS plug-in heads, cold shrink terminals, busbar intermediate joints, columns, supports, hardware, wall bushings, wall partitions, grounding hooks, lightning arresters and other installation materials, excluding measurement, transportation, installation and acceptance. Cold shrink terminals, cold shrink intermediate joints, intermediate joint metal connectors and stainless steel hardware are required, which can be purchased from accessories. If other supporting products and services are required, the price is negotiable). Ⅱ. Service advantages: fast delivery, stable and reliable quality, and a warranty period of 10 years. Ⅲ. Processing and customization process: 1. The buyer provides drawings (the drawings include bus voltage, rated current, number of connected equipment, laying conditions, altitude, meteorological conditions, system short-circuit capacity, transformer, generator, and motor capacity). 2. The supplier designs the processing drawings according to the drawings provided by the buyer. 3. The buyer reviews and confirms the supplier's processing drawings. 4. The supplier processes according to the confirmed drawings. 5. The supplier conducts factory inspection, which is 100% inspection and meets the standards "35kV and below solid insulated tubular busbars" DL/T1658-2016 and "7. 2kV-40.5kV insulated tubular busbar technical specifications" Q/GDW 11646-2016. The supplier issues a factory inspection report. 6. The buyer inspects the goods, and the inspection method is negotiated by both parties. ![]() | |
Related Link: Click here to visit item owner's website (0 hit) | |
Target Prov.: All Provinces Target City : All Cities Last Update : Mar 11, 2025 10:13 PM Number of Views: 4 | Item Owner : exporter Contact Email: (None) Contact Phone: (None) |
Friendly reminder: Click here to read some tips. |